CENTRAL PLACE, LEEDS

CJP was awarded the contract to carry out the internal plasterboard and plastering at one of Leeds’ zero carbon housing developments.

Internal Plasterboarding

Taping & Jointing

Contract length 104w

186 New Build Homes, Clifford Gardens – Skipton

Internal plasterboard and T & J to 186 two, three and four bedroom houses

Metal stud partitions

Internal Plasterboarding

Taping & Jointing

Contract length 104w

51 Low Carbon High Performance Homes – Stall, Leeds

Internal plasterboard and T & J to 26 four bedroom houses and 24 one and two bedroom apartments. 

Metal stud partitions

Internal Plasterboarding

Taping & Jointing

Contract length 30w

27 Houses, Balmoral Gardens – Darwen

Full K-Rend render to outside of all 27 houses and Dry lining and plastering to 27 houses in Balmoral Gardens in Darwen, Lancs.

External Coloured Render

Wetherby, White

Internal Plasterboarding

Taping & Jointing

Contract length 12w

11 Luxury Homes Catterall Ladge Court, Lancashire 

Full K-Rend render to outside of all houses, Finished in TC15 for 11 luxury homes at Catterall Court, Lancashire 

K Rend

Silicone TC 15 in Limestone White

Contract length 4w

Low Maintenance Finish

Salkeld Homes

4 Luxury Homes at Lacy hights, Little Salkeld, Penrith.  CJP Northwest were contracted to render the outside of 4 properties including all internal plasterboard and plastering.

K Rend

Silicone TC 15 in Pearl

Contract length 10w

Low Maintenance Finish

Eagle & Child Clitheroe

CJP Northwest was contracted to complete the internal metal partitions, plasterboarding, plastering and external rendering of 5 properties which was converted in the former Eagle & Child pub in Clitheroe.

K Rend

Silicone TC 15 in Pearl

Low Maintenance Finish

Internal Partitions

Contract length 15w

The Macclesfield Academy

CJP Northwest was contracted to re-render a total of 3000 square meters, the process needed to be done while the school was still in operation with minimal disruption, the colour was match to the building next door providing consistancy throughout the school complex.

K Rend

Silicone TC 15 in Pearl

Low Maintenance Finish

Area 3000 m2

Contract length 16w

Address

Wade Platt Farm, Longsight Road, Langho, BB6 8AD

Phone

07821 329377

Email

info@cjpnorthwest.co.uk